Off-grid Area / Multi-energy Complementary Power Supply Project – (Product: CHS2)

Baghdad, Iraq Office 50kW / 100kWh CHS2 All-in-One ESS (Connect Generator)
Reliable Power for Offices in Iraq
Power outages are a daily challenge in Iraq. To keep operations running smoothly, SAJ has completed a 50kW / 100kWh CHS2 All-in-One ESS for an office building in Baghdad.
🔹 What this system delivers:
• Seamless backup power during grid outages
• Smart switching between grid, battery, and diesel generator
• Zero interruption for critical office equipment
When the grid goes down, CHS2 instantly switches to off-grid mode, working with the generator to ensure stable, reliable electricity — without downtime.
A practical energy solution designed for real office needs in Iraq.
Find Out More on LinkedIn SAJ