SAJ's Milestone Project in Malaysia: Self-Consumption Excellence for Glass Factory—perfectly aligned with today's local energy policies and real industrial needs.


1.1(1)

 

 Alor Setar, Malaysia          Factory            January, 2026       

 SAJ 4*110kW C6 String Inverter + 2*261kWh CM2 All-in-One ESS

 

Project Setup

• 4 × 110kW C6 String Inverters
• 2 × 261kWh CM2 All-in-One ESS (Liquid Cooling)
• AC-coupled system + smart EMS

 

What makes this project special:

• Cuts demand charges through peak shaving
• Maximizes PV self-consumption—no wasted solar
• Enables TOU arbitrage where applicable
• Provides reliable backup during grid outages
• Avoids costly transformer upgrades as loads grow
• Supports green certification and ESG incentives

With EMS as the smart brain, PV and storage are controlled precisely, fast, and simultaneously, delivering true energy efficiency and compliance.

A powerful example of how SAJ is redefining C&I energy storage in Malaysia.